G3 Made Simple
Locomotive Project No. 1
A Live Steam 0-4-4 Tank
A step-by-step construction guide provided
by our contributor “Ginger”.
< PREVIOUS PART
Part 15
<< Gauge3.info HOME
Part 16 : – The cab, side tanks and pump.

Whilst chewing the fat with some members of my local MRC recently, I realised that most of them model in many scales, so one is not alone. Work on James has resumed after a long spell building live steam in Gauge 1 and BG10. The cab and side tanks for any tank engine take a disproportionate amount of time compared to building the chassis and cylinders. Everything on the “inside works” is hidden from view, however an accurate representation of the body work can really make an engine or conversely mar it, so attention to detail is essential. The drawing below is from the SLS Journal 1943 and shows what is trying to be achieved – eventually.

 

The cab

 

In essence the design of 0-4-4 tank engines have a cab and the associated coal bunker. The actual construction of the cab depends upon the prototype approach to the cab, coal bunker and the side tanks. For example the Drummond M7 has an integral one piece cab and coal bunker side sheets and also the side tank sheets. By contrast the Stirling SER Q, Billinton D3 and MR Johnson tanks had the cab side sheets indented and the water tanks are a separate item. Some designs have plain straight edged water tanks and coal bunkers, others have a curved valance, generally about 9 inches high at the top edge.

 

You also need to give some thought if the cab rear sheet is to be cut out at the bottom end to accommodate your fuel tanks for meths or gas, or if this sheet is to rest on the footplate. Also you need to work out if it is possible to fit a hand pump into the side tanks as some designs have straight sided tops such as the Drummond M7, Stirling Q or if the top of the tanks slope inwards restricting access to the pump i.e. the Brighton Billinton D3.

 

Construction of the cab and coal bunkers is however a straightforward exercise in metal bashing. Working from the General Arrangement drawing, draw out the design and convert these to sheet metal using either brass or nickel silver. My preference is for nickel silver as this takes paint better and I used 32 thou half hard sheet from Eileen’s Emporium throughout. Join the coal bunker rear sheet and side sheets using ¼ inch brass angle riveted up with say 3 or 4 copper rivets.

 

Cut out the cab sheets with care as the front sheet has to fit over the boiler without leaving an unsightly gap. It is advisable to make up a pattern from stiff card to work out the closest fit before cutting metal. Join the front sheet with ¼ inch brass angle. The bottom edge of the cab side sheets are riveted to half inch brass angle suitably filed down around the cab entrance if these are not to be too unsightly. Unfortunately it is necessary to mill all of the brass angle to ensure a 90 degree angle as none of the stock available from China is accurate with more like a 95 to 100 degree angle.

 

The problem with the Stirling design is that the cab upper section is not flush with the lower sides so as you can see from the picture, a way had to be found to assemble all of these sections. The valances on the cab and the side tanks were made from ½ inch brass tube, sliced in half with a hack saw. One edge was filed flat as a base line and the half section squeezed in the large vice to make a flat area where the valance is riveted to the top of tank side. The rough edge can then be sawn and filed to the correct depth, prior to riveting the finished valance to the cab and tank sides. This work is a bit hard on the hands but the results are well worth it. Bending curves from sheet is not advisable unless you have access to bending rollers.

 

The side tanks

The issue with the side tanks is that you will probably want to place the hand pump inside a tank so the tank body must be made in such a way as to clear the driving wheels, just like the real thing. In order to reduce riveting and sealing the tank body, basically a flat box shape, is made from only three parts – an inside wrapper folded up  at the ends  to form a flat U shape from a sheet of brass, the outside side from a sheet of nickel silver and the base. The components are pictured below.

 

The base is 1/16 inch brass and cut away to clear the driving wheel. The brass U shape is riveted to the base with a small bit of ¼ brass angle. Measuring up all of the parts for the side tanks needs care as you need to allow for the width of the boiler including the boiler wrapper and insulation. Secondly you need to place the side tank in the correct orientation to the cab. Last but not least do allow for the clearance between the assembled tank and the driving wheel, mine turned out to be much too close for comfort.

 

It is advisable to delay riveting up the outer cab sheet until the tank and pump have been positioned and secured to the footplate, otherwise it will be very difficult to get the cab and side tanks lined up accurately.

 

The hand pump

There are several designs of hand pump and I chose to explore two types used by the Gauge 1 community. These are illustrated below and look very similar. The one on the right is from a kit sold by Keith Cousins the other one was designed by Locosteam to fit low sided tenders. Both tanks have a base made from 1/16 in. brass with a half inch diameter brass barrel reamed out to 3/8 inch. The Locosteam (no longer trading) design has a barrel 1 and 15 /16 in. long whereas the KC design is much shorter.

 

I made up the Locosteam type first and then realised that the pump could not function as the barrel is set so low that it conflicts with the protective arch covering the driving wheel. The only difficulty in assembly is soldering the barrel to the vertical upright and the base and also the pump handle extension sitting on top of the barrel. Careful use of steel wire to hold everything in place whilst silver soldering gets the job done.

 

The photograph below illustrates the smaller pump in position inside the tank body before fitting the final brass angle and the nickel silver tank side.

 

Finally with the outer tank side riveted to the inner body and the cab and tanks screwed to the footplate, the engine is now beginning to look as if it will be finished soon.

 

 

 

The final part will cover the regulator, fuel arrangements (gas or meths) and some of the fiddly bits.