This episode covers the finishing touches to the rolling chassis, in particular:
· Quartering the wheels
· Crank pins
· Coupling rods
· Making the footplate and valances

Before we start here is a drawing from Model Railway Constructor from 1950 of a rare bird from the Barry Railway. Only four of these were, two by Vulcan in 1892 and two by Sharp Stewart in 1895. They must have looked grand in dark crimson lake.
Crank Pins
These are made from 3/16 inch diameter silver steel rod. Mount the rod in a 3/16 collett and turn one end to 1/8 inch diameter and 6 mm long. Tap this end 5 BA using a die holder held in the tailstock. Cut off to allow enough material, say 15 mm to allow for the coupling rod bearing hole at 6 mm and allow for the hole in the wheel hub of 8 mm. Mount the 3/16 end carefully in the collett and turn down the end to go into the wheel hub to exactly 0.126 thou for a press fit. If this diameter is exceeded you will not be able to get the crank pin into the 1/8 inch hole in the wheel and if it is turned to 0.125 thou you might have to use Loctite.

While you are using the collett turn a small marking pin from brass rod such that one end fits into the wheel hub hole and the other end is turned to a sharp point.
Time taken 1 hour.

Quartering the wheels
There are several ideas and set ups for quartering wheels that involve making a jig, however the easiest method by far is one taught to me by my friend Reg. Providing you have access to a lathe all you need is two lengths of 3/16 inch steel rod, about 2 inch long, which are the same diameter as the crank pins at 3/16 inch. Turn a point on one end of each of the rods.

Press the crank pins onto the two wheels that will go on the crank axle. Use the bench vice for this and protect the ends of the crank pins to avoid damaging the 5 BA threads. At this stage do not press the other crank pins onto the other pair of wheels. Remembering to insert the correct axle box, now press one wheel onto the crank axle. If the diameter of the crank axle that enters the wheel hub is slightly less than 3/8 inch you might need to resort to Loctite.

If the diameter of the axle ends is slightly more than 3/8 then it is essential to make up a brass wedge to be inserted tightly between the crank webs to prevent bending the crank axle as you press home the wheel - otherwise the whole lot might end up in the dustbin! Take your time making the wedge and ensure that this wedge does fit nice and tight but without needing to resort to a hammer!

Now come the easy bit. Mount the crank axle with the one wheel already in place, suspended between the points of the two 3/16 steel rods held in the 3 jaw chuck and the drill chuck. Remembering to insert the second axle box, place the axle end without a wheel at the headstock end of the lathe. (See photo below). The ends of the rods go into the holes drilled in the ends of the axle.
The cross slide is perfectly horizontal and parallel to the lathe bed. A bar of metal is required, held in the cross slide so that it will just fit underneath the crank pin and also the rod held in the tail stock. For this stage I use the bar of a cutting tool as it is just right, and pack this up with slices of thin metal so that the bar just slides smoothly under both the crank pin of the assembled wheel and the rod held in the tailstock such that the wheel cannot be rotated at all, thus the crank pin and the steel rod are absolutely horizontal to the lathe bed.

Next take a right angle square and resting this on the lathe bed, press up against the crank pin of other wheel and the rod held in the chuck. Push the second wheel onto the axle and adjust its position until you can get no movement, of the assembly of both wheels. Thus the 90 degree angle is now achieved. Carefully remove the assembly from the lathe and press home in the vice. It actually does not really matter if the angle is 89 or 91 degrees provided both pairs of wheel-sets are at the same angle.
Time taken 45 minutes

Coupling rods
The coupling rods can be made from steel bar or nickel silver. If steel is used this will require bronze bushes to be made. Nickel silver does not require bushes and also does not rust, so this material is to be preferred. Cut off two lengths long enough for the coupling rods, thickness of 5/32 or 3/16 if you can get it, and mark with blue fluid. Mark the centre line, centre punch and using dividers mark the circle of the big end. Drill through for 3/16 inch.

We now need to mark the other end of the coupling rod at the correct distance between the wheel centres. You can just measure the distance and drill the second hole, hoping to get it right, but a better method is to measure from the job as explained below. Place the quartered set of wheels and axle boxes in the chassis held upside down between bits of wood or suitable objects. Now take the un-quartered set of wheels and axle, and press one wheel onto the plain axle and press home in the vice. Assemble the wheel and axle with the second axle boxe in the chassis, but not the second wheel. Insert the special marking crank pin into the wheel.

With both wheels set at the same alignment, front dead centre, and with the drilled end of the rod mounted onto the crank pin of the quartered wheel set, press the other end of the rod up and down to make a mark on the blued part of the rod by means of the marking pin. Turn the wheels to rear dead centre and repeat the marking process. Remove the rod and look to see if both marks are in the same position or close enough. Centre pop and drill very carefully, opening out to 3/16 inch. Press the crank pin onto the wheel that has just been used for the marking process.

The picture below shows a coupling rod blank after drilling using the marking pin on the right, and a finished rod filed to shape.
With both axles, three wheels and axle boxes in place in the chassis, place the coupling rod onto the pair of crank pins and see if you can rotate the wheels. Repeat the marking process for the second coupling rod for the other wheel but do not press the wheel home this time as the wheel set has to be quartered. After marking and drilling the second hole in the second coupling rod, press home the last crank pin and quarter the wheel set as described above. It may be necessary to ease the holes in both coupling rods a bit with a round file until the wheels rotate without binding. The pair of rods were finally tested on the engine and run on air to see if the rods rotated smoothly.

After testing the rods they can be filed to profile either in a vice or mill if you have access to one. This process is very time consuming and if you have used steel plate you will find that the steel bends in the opposite direction to filing.

Time for making coupling rod blanks and drilling was 15 minutes.
Time taken for shaping the coupling rods was 2 ½ hours.

Footplate and valances
This task is a simple exercise in sawing, filing and riveting metal that can take up to 6 hours, but needs to be done carefully to avoid distorting the metal and to ensure that it looks good when assembled onto the engine. The footplate can either be made as a single plate of material with holes cut in the middle to clear the wheels etc or can be made as two strips of material that extend from front to rear buffer beams. I now use 18 or 20 gauge steel plate rather than brass plate as this is stronger. You can either make up a pattern in cardboard to make the cutting task quicker or measure from the job.
The valances are made from ½ inch brass angle filed on one side to the depth of the prototype and cut carefully to be a tight fit between the buffer beams. It will be necessary to rebate the ends of the buffer beams and the ends of the valances to ensure that they fit neatly. When both footplate and valances are finished they are riveted with 1/16 inch rivets.

Time taken for footplate was 3 ½ hours
Time taken for the valances and fitting to buffer beams was 1 hour
Time taken for riveting valances and footplate was 1 hour

Replacement horn keeps
The original horn keeps made from brass angle proved impossible to install from the outside when the engine was assembled as there is now way to get a screw driver between the spokes, so new ones had to be made from brass section. Made from square brass section and filed to shape so that they can be installed from the back of the wheels (see picture above.)
The picture above is of the air tested chassis with shaped coupling rods and steel footplates.
Total time for this episode was 10 hours, most of which was simple "metal bashing". Next episode making the boiler.