Part 13 : The Boiler
A lot of twaddle circulates about the hazards of making a boiler. However, speaking frankly dear reader, if nature has not endowed you with the necessary common sense to realise that pointing a propane gas flame at 600 degrees Celsius at yourself is dangerous, then boiler making is definitely not for you.

Boiler making is actually very simple and only requires that three rules are rigorously followed:
 All metal surfaces to be soldered must be absolutely clean and free from grease
 The right amount of heat must be applied in the right place
 Great care and attention to safety must be taken when using a gas blow torch

I have never had any problems with safety proving you use common sense. I have caused more self harm in the kitchen by spilling boiling water on my foot straining some broccoli; cutting my finger when slicing carrots and banging my head on an open cupboard door. Just remember that the flame on a gas torch is at 600 degrees and can cause serious damage to your person if you are so wilfully stupid enough to turn upon yourself!! Much of the potentially unpleasant aspects of silver soldering have been removed since Cadmium is now banned from use as a component of silver solder.

Boiler design was covered briefly is part 3. The design of the boiler chosen for the 0-4-4T is based upon the "C" type developed by John van Riemsdijk's of the Gauge 1 Association back in 1960. This was designed to be simple and cheap to make and can use meths or gas firing. Literally thousands of them have been made and they are extremely safe to use. The boiler is very easy to make provided you have access to a Sievert gas torch, a bottle of propane gas and some fire bricks.

John Van Riemsdijk specified at least three ½ inch copper flue tubes for a boiler diameter of circa 2 ½ inches The design is modified from the original "C" type such that a small firebox area has been incorporated allowing for fitting of back head controls without resorting to extension tubes and was developed by John Shawe. If you do not have the skills or wherewithal to make a boiler you can get one made for you from several Gauge 1 suppliers.

Boiler component fabrication - 7 ½ hours
The components that are required are illustrated below consisting of the boiler barrel; three ½ inch tubes; back head, front tube plate; throat plate and fire box wrapper. Six bushes are illustrated, two large ones 5/16 x 32 for the safety valve and regulator, four ¼ x 40 for the steam take off turret, clack valve, blower and lower water gauge socket. The water gauge elbow and flame guard are not illustrated yet.
Getting started
All the materials for the boiler are made of copper, other than the bushes. Copper is not very nice to handle as it can strip the natural greases from your hands and you might end up with splits to your fingers. Sometime it is wise to wear rubber or cotton gloves.
Construction began with the boiler shell. A length of 2 ½ inch diameter copper tube would be exactly right for the scale diameter (outside clothing) but would not allow for any insulation material, so fortunately some 2 3/8 inch diameter was available which is just right. A length 8 ½ long was cut and the ends easily squared off using a right angle square and some adroit filing with a large flat file to get the firebox end really square.
Mark a line up the centre by placing the shell on a flat surface and mark a line with a pencil mounted on a bit of wood and move this up and down the boiler shell. Referring to the scale diagram that you made earlier, mark the position of the bush for the safety valve and the steam take off which is about ¼ inch from the end of the boiler. The take-off bush will sit just inside the cab so measure carefully from you diagram to get it right. Drill through and open out to 5/16 inch diameter for the take off bush and 3/8 inch for the safety valve bush, however it is better to finish these two holes off when you have made the bushes.
Mark out the position of the firebox retaining flaps at the rear end making sure that they are equidistant from the top centre line. Simply use a bit of paper wrapped around the shell with marks in pencil for the top mark and experiment until you find the half way mark. The flaps required need to be one inch wide. Cut across the body with a hack saw and then carefully along the body thus releasing the flaps. Anneal the flaps carefully before bending these down, you may need to adjust the final position of the flaps later when the firebox is made. The flaps will need to be 11/8 inch apart (inside dimension between the flaps) to take the firebox wrapper (see below)

The next job is to make the front tube plate. Mark out the inner diameter with great care onto a suitable bit of 1/16 inch copper plate. Then measure the position of the three ½ inch flue tubes arranged in a pyramid shape. You need to remember that the tubes need to be inclined by about 1/8 inch rising from the firebox tube plate to front tube plate. Cut out the plate and file very carefully to the inner diameter line until the plate just fits smoothly inside the boiler tube. Beware achieving a smooth drop fit by filing off too much, otherwise you will have difficulties later on When you are happy that the fit is a tight as possible, but without needing force, drill the holes for the three flue tubes and open out to ½ inch diameter.. Copper is not a very kind material, You might get away by holding the copper in a vice and using a vertical drill, or you might need to resort to hand drill and files.
Next up are the bushes which must be made from either bronze, gun metal or phosphor bronze (you must not use brass for these bushes as they will become corroded over time). The design for the regulator and the safety valve calls for a 5/16 inch by 32 bush. All the rest are ¼ inch by 40. Make the bushes with a 1/8 inch flange and 5/8 in diameter for the two 5/16 bushes and 3/8 inch diameter for the ¼ inch bushes.
Make the firebox wrapper before the back plate, the reason will become obvious. This is a sheet of 18 gauge copper (16 gauge is really not required here) as the firebox sheet will not need staying. Ensure that it is long enough, mine was 8 inch by one inch wide. Anneal the sheet and bend over a former such as a broom handle, a smaller diameter copper tube or a bottle of the right diameter e.g. circa 1 inch to fit inside the flaps of the boiler (see above).
The back plate is next. This is also made from 1/16 copper sheet. Mark out the diameter of the boiler plus an extra 3/32 to 1/8 inch all round to allow for the soldered joint. Then mark out the firebox part which can be estimated from your scale diagram. The width at 44 mm must be greater than the width of the firebox wrapper. Cut out with a hack saw and file to shape. Mark out the position of the bushes with great care.
Remember that the clack and lower water gauge bushes must fit above the firebox sheet such that they are immersed in water, so place the firebox wrapper on the back head and mark out the boundary with a pencil and judge carefully the position of the clack and lower water gauge holes. When happy with the positions of all of these holes, drill all of the holes for the back head bushes - one large one for the regulator, and three to take the blower, clack and the lower end of the water gauge.
The firebox tube plate is a small sheet of 16 gauge copper with identical holes to those already drilled in the front tube plate. Allow enough surplus material to permit the solder joint around the firebox wrapper.
The water gauge elbow is a chunk of gun metal shaped roughly into an L shape in the bench vice and then turned in the lathe 4 jaw chuck with a tapped end ¼ x40 to take the water gauge and a hole at the elbow end to take a short length of copper pipe that will be the register just inside the boiler shell.
Task no 6 is the "big one". Before this is attempted you must carefully file the back end of the boiler and the firebox wrapper flush (seen above) so that the surfaces are flat to receive the back head plate. This soldering task requires a big burner to get the job heated quickly - first at the firebox end and secondly a few minutes later at the front end. Hold the back head (sub assembly from task no 3) tightly in position with a couple of loops of steel wire.
It may be necessary to adjust the fitting of the back head by bending the copper slightly to ensure that the plate mates up with the boiler end. Drill the 1/8" hole for the water gauge elbow in the boiler such that when assembled the two surfaces of bushes that take the gauge fitting are more or less in alignment. Shove a bit of 1/8" copper tube up the joining end and of the press the fitting carefully into the boiler.
Soldering Tasks
We are now ready for the soldering tasks, which are listed below in the order required:
1. Solder a length of 1/8 inch copper pipe to the top hat bush for the blower
2. Solder the two bushes for the safety valve and steam take off on the boiler top
3. Solder the bushes on the back of the back head including the top hat assembly from task No 1 above.
4. Solder the wrapper to the firebox tube plate and at the same time the tubes into the front tube plate
5. Solder the firebox wrapper, tubes assembly from task No 4 to the flaps on the boiler
6. Solder the back head, front plate and water gauge elbow to the boiler "at one sitting"
7. Solder the flame guard (dummy firebox) to the bottom of the boiler

You will need at least three sticks of 1.0 mm low melting point solder which are supplied in 3 foot lengths and a range of Sievert burners. Do not forget that all joining surfaces must be cleaned up with fine files and sometimes a good dose of lemon juice on the assembled parts for 15 minutes will ensure clean joints.
The first task is an easy one as all you need to do is poke a length of copper tube into the back of the "top hat" bush, heat up and apply a little solder to the joint. A smallish flame such a 3941 Sieveret standard burner (3.1 kW) will be fine for this task.
The second task will need a bigger flame as there is a lot of copper to heat. Check that the two bushes for the safety valve and the steam take off fit in the holes nicely, you may have to file a bit around the hole to get a fairly tight fit. Lay the boiler between tow fire bricks and use a 2941 Sieveret standard burner (7.7 kW) so that you get the job heated up quickly.
For the back head (task No 3) the easiest method is to place two firebricks on end and place the back head with the copper blower tube hanging downwards. For task no 4 it is wise to hold the wrapper to the front tube plate with steel wire, garden wire will be fine for this tightened up with pliers. Ensure that there a few nicks in the tube plate so that the solder runs through both sides of the joint around the tubes.
Task No 5 is an important one to get right. Secure the flaps on the boiler to the downward protruding flaps on the fire box wrapper with two copper rivets. Place the front tube plate in position just to ensure that the tubes are in the correct alignment whilst soldering up, but the front tube plate will not be soldered until task no 6. This job will require quite a lot of heat and it is vital to ensure that the mating surfaces on the flaps are absolutely clean. Again use fine files and lemon juice to clean the mating surfaces. The picture shows the end result.
Last of all make the flame guard from a sheet of copper bent in a U shape and resembling the shape of the firebox, use the scale drawing as you reference for this from which the dimensions were derived. The front of the wrapper must be well clear of the crank axle webs and the big end of the connecting rod. You can just see one of the two copper rivets holding the wrapper to the flaps in position in the picture below. A length of steel wire is used to hold the wrapper in position during soldering up. You need to be quick when soldering here as you do not want to run the possible risk of melting the soldered joints at the bottom of the back head.

The picture of the back head above is what you are aiming for at the back end. Lay the boiler upright resting the back head on a fire brick. Apply the solder paste and go for it with a big Sievert 2942 burner (26kW). Then apply the flame to the front tube plate which should be good and hot by now. After cooling off. check carefully to see that there is a god solder fillet on all of these joints. If not clean up and apply the burner again to the affected parts.
At this stage I like to test the boiler under pressure (see below) using a simple lash up of a large diameter pressure gauge screwed directly in to the boiler bush and using a tender pump to apply the pressure, sitting in a plastic tub full of water.
The finished boiler is show above after cleaning up with a lemon juice bath, well yes it does look as if it could be cleaner!

Total time taken to make the boiler was 11 ½ hours in total as follows:
Making up the parts from copper and bronze = 7 ½ hours
Water gauge elbow = 45 mins
Flame guard wrapper = 1½ hours
Soldering tasks = 1 hour 45 mins
SAFETY WARNING : It is essential that the following procedures are followed carefully, in particular taking note that the strength of soldered joints is critical. If you doubt your ability to produce strong soldered joints, then you should consider whether it is sensible and safe to construct your boiler without assistance from an experienced boiler maker. Boilers can explode causing death or injury so it is important that no risks be taken. If in any doubt as to your ability to produce a safe boiler, you should seek professional help.